×

Warning

JUser: :_load: Unable to load user with ID: 62
Print this page
Tuesday, 18 June 2013 14:38

Walton Bridge - Progress and Road Closure Dates

Rate this item
(3 votes)

Residents may have attended the recent public meeting at which the progress and final construction schedule of the new Walton Bridge was discussed. If you were unable to attend, you may wish to click on the following link to update yourself on the planned road closures which will be necessary before the final opening.

http://www.surreycc.gov.uk/waltonbridge

1 comment

  • Comment Link Pamela Cabannes-Barrall Thursday, 20 June 2013 16:25 posted by Pamela Cabannes-Barrall

    It's really good news that AT LAST we have a new bridge at Walton.
    However, I think a chance has been missed by not designing a bridge without a road joining it at the Walton end.